Field Guides
More stories
-
ASTM D4541 pull-off adhesion test report: what to include
An ASTM D4541 field report records method and protocol, tester and dolly, glue, site conditions, each pull-off value with its fracture, and the average.
-
Zinc-free pigments to replace zinc phosphate in a primer
Calcium and calcium-magnesium phosphates suit alkyd and epoxy primers, strontium polyphosphates coil and aircraft primers. Confirm any swap by trial.
-
Typical properties on a TDS: what they mean and what they do not
Typical properties on a TDS are averages from past production, not guaranteed limits. Learn what they promise and when to ask for a spec or a CoA.
-
Industrial chemical site survey: what to cover before you quote
A chemical site survey before a program recommendation covers equipment, current products and usage, operating data, problem history, contacts and waste.
-
Lessons learned template for a closed case: what belongs in it
A lessons learned template for a closed customer case: symptom, evidence, cause with certainty, action, signal to watch, and customer details removed.
-
How to name SDS, TDS and CoA files so staff can find them
Name SDS, TDS and CoA files in one order: brand, product, document type, language, then the ISO revision date for SDS and TDS or the lot number for a CoA.
-
How to keep an approved products list for each customer
Keep a customer's approved products list by filing every approval with grade, plant and use, flagging changes that need re-approval and checking orders.
-
Non-phosphorus cooling tower treatment: risks to check first
Before a cooling tower goes phosphorus-free, check galvanized white rust, steel protection, sulfate and iron in makeup water, biology and discharge.
-
Certificate of analysis vs conformance: what a buyer needs
Send a certificate of analysis when a chemical customer needs measured lot results and a certificate of conformance when a declaration of spec is enough.
-
Shorter sealant skin time on a new batch: lot or site conditions
A shorter sealant skin time on a new batch often traces to warmer or more humid air, cartridge temperature or lot age. How to test both lots side by side.
Talk to us about your sales team.
Custom plans, custom terms, security reviews and onboarding across teams or branches. Tell us a little about your organization and we will reply with a starting plan.
Contact Sales- 01Start from site data and your documents
Bring in the TDSs, test reports and site records your team already has. Where a case has too little to go on, the agent searches the web for public sources such as manufacturer data and standards.
- 02State the case
Describe the customer's situation in plain words. The agent reads the site's conditions and history, proposes the task that fits, and starts when you say go.
- 03Review the reasoning, step by step
Each step shows what was considered, what the evidence supports and what was ruled out, with the source behind each point. You can carry on, ask for changes or stop.
- 04One document for this customer
The case ends in a document built for that customer: the conclusion, the reasoning, the conditions it depends on and what to do next. Share it through Field Care when you choose.