The latest from Lubinpla
More stories
-
Chemical Quotation Template With Unit, Basis and Terms Columns
A free chemical quotation template with unit, as-delivered or active basis, tax, Incoterms, validity, and a source and as-of date for every price and term.
-
Formulation Brief Template With a Bench Trial Plan for Chemicals
A formulation brief template for industrial chemicals: measurable targets with units, constraints, candidates, a run matrix and stop criteria set first.
-
Raw Material Substitution Checklist for Chemical Formulations
A free raw material substitution checklist: record the outgoing material's function, compare substitutes and fix what must be retested before bench work.
-
Certificate of analysis vs conformance: what a buyer needs
Send a certificate of analysis when a chemical customer needs measured lot results and a certificate of conformance when a declaration of spec is enough.
-
How to read an ASTM C1521 sealant field adhesion test
ASTM C1521 reads a field pull by failure mode: adhesive failure flags poor bond to trace to cure or surface prep; no result proves the joint watertight.
-
Shorter sealant skin time on a new batch: lot or site conditions
A shorter sealant skin time on a new batch often traces to warmer or more humid air, cartridge temperature or lot age. How to test both lots side by side.
-
Cooling tower chemical dosing: how to check the inhibitor dose
Expected cooling tower inhibitor use equals makeup divided by cycles, times the target dose. Compare it with actual drum use and see what a gap points to.
-
NORSOK M-501 Edition 7: what a pre-qualification package contains
NORSOK M-501:2022 ties pre-qualification to each coating system data sheet. See what the package holds and how to match test reports to the system.
-
Setting the final rinse conductivity limit before powder coating
Measure final rinse conductivity on drip water from parts. About 30 µS/cm is a common guide; your pretreatment supplier or approval sets the real limit.
-
Phosphate ester fluid compatibility with seals, hoses and paints
Phosphate ester fluid swells nitrile and neoprene and lifts acrylic or latex paint. Butyl, FKM and epoxy usually survive. Check every wetted part by grade.
Talk to us about your sales team.
Custom plans, custom terms, security reviews and onboarding across teams or branches. Tell us a little about your organization and we will reply with a starting plan.
Contact Sales- 01Start from site data and your documents
Bring in the TDSs, test reports and site records your team already has. Where a case has too little to go on, the agent searches the web for public sources such as manufacturer data and standards.
- 02State the case
Describe the customer's situation in plain words. The agent reads the site's conditions and history, proposes the task that fits, and starts when you say go.
- 03Review the reasoning, step by step
Each step shows what was considered, what the evidence supports and what was ruled out, with the source behind each point. You can carry on, ask for changes or stop.
- 04One document for this customer
The case ends in a document built for that customer: the conclusion, the reasoning, the conditions it depends on and what to do next. Share it through Field Care when you choose.