Summary
The AIAG PPAP 4th edition requires bulk material PPAP only when the customer specifies it (as of October 2026). Then the minimum submission is the Part Submission Warrant and the Bulk Material Requirements Checklist agreed with the customer, plus the elements it marks as required. Level, forms and record retention follow the customer's requirements, which are contract terms, not law.
The AIAG PPAP manual, 4th edition, applies PPAP to sites supplying bulk materials but states that for bulk materials PPAP is not required unless specified by the authorized customer representative (AIAG PPAP 4th edition, as reproduced in Bóllo, 2008).
Ford's PPAP customer-specific requirements, effective 15 June 2026 for programs using the SCCAF process, are written for use with the AIAG PPAP Fourth Edition and list bulk material PPAPs among submissions that may need a paper Part Submission Warrant (Ford Motor Company, 2026).
One automotive customer's supplier handbook keeps PPAP records for the time the part is active plus one calendar year, whatever the submission level (Astemo Americas, 2026).
IATF 16949:2016, clause 8.3.4.4, requires a product and manufacturing approval process conforming to requirements defined by the customer (IATF 16949:2016, as quoted on Elsmar Cove, 2016).
This answer covers bulk chemicals such as adhesives, sealants, coatings, lubricants and process chemicals supplied into the automotive supply chain under the AIAG PPAP manual. It does not cover the German VDA 2 production process and product approval, aerospace first article inspection, or a customer that names its own approval process instead of PPAP. The AIAG manual is paid; quotes from it here come from named published reproductions.
What and whom do PPAP bulk material requirements cover?
PPAP bulk material requirements cover what the AIAG PPAP manual calls bulk materials, and they apply to the organization that supplies those materials to a customer requiring PPAP. The 4th edition glossary, as quoted by an Elsmar Cove moderator, defines the term: "Bulk Material is a substance (e.g., non-dimensional solid, liquid, gas) such as adhesives, sealants, chemicals, coatings, fabrics, lubricants, etc." (AIAG PPAP 4th edition, as quoted on Elsmar Cove, 2011).
The same glossary entry adds that a bulk material may become a production material if the customer issues it a production part number (Elsmar Cove, 2011). A grade bought against a customer part number can therefore fall outside the bulk default, under which PPAP is not required unless the customer asks for it.
Only in one narrow case does the bulk appendix reach a tier down, to the suppliers of your ingredients. A forum quote of page 35 of the 4th edition reads that organizations are responsible for applying PPAP to their suppliers of ingredients which have organization-designated special characteristics (Elsmar Cove, 2012).
Bulk material requirements apply alongside the customer's own requirements. As of October 2026, AIAG sells the manual as PPAP-4 (AIAG, 2026), and Ford's PPAP requirements effective 15 June 2026, for programs using the SCCAF process, are written for use with the AIAG PPAP Fourth Edition (Ford Motor Company, 2026). Ford's PPAP document states it applies to organizations supplying production and service parts to all Ford regions and joint ventures (Ford Motor Company, 2026). After the manual, the customer's own document is the second source to read.
Is PPAP required for bulk materials by default?
Under the AIAG PPAP manual, 4th edition, PPAP is not required for bulk materials by default. It becomes required when the authorized customer representative specifies it. The applicability text, as reproduced in a 2008 paper and in later forum quotes, reads: "For bulk materials, PPAP is not required unless specified by the authorized customer representative." (AIAG PPAP 4th edition, as reproduced in Bóllo, 2008)
Catalog parts have the opposite default. The same section states that an organization supplying standard catalog production or service parts shall comply with PPAP unless formally waived by the authorized customer representative (Elsmar Cove, 2024). As one forum moderator reads the glossary, a bulk chemical sold from a catalog still counts as a bulk material here (Elsmar Cove, 2011).
In practice, many automotive customers do specify it. Astemo Americas states in its supplier handbook that for bulk, raw, catalog and indirect material, it is at its discretion whether PPAP will be required and at which level (Astemo Americas, 2026). Ford's PPAP document names bulk material related PPAPs as a submission route, which indicates that Ford receives them (Ford Motor Company, 2026).
For a chemical supplier, the working rule is to look for a PPAP requirement in the purchase order, the supplier quality manual and the customer-specific requirements. If none of them names PPAP, the manual's bulk default applies. If the request came only verbally, ask for it in writing.
What must a chemical supplier submit under the Bulk Material Requirements Checklist?
The supplier submits the Part Submission Warrant (PSW) and the Bulk Material Requirements Checklist, completed and agreed with the customer, plus the elements that checklist marks as required. A forum reply citing page 17 of the 4th edition gives the minimum bulk submission as the PSW and the Bulk Material Checklist (Elsmar Cove, 2024). On the agreed checklist, any element not needed is marked "Not Required" (Astemo Americas, 2026).
Each customer issues its own checklist, so the elements differ from customer to customer. Ask for the customer's form before preparing any data. The table below separates what goes into the submission from what stays on file, with one customer's published handbook and Ford's PPAP document as examples.
Requirement (source) | Default for bulk material | What the chemical supplier submits or keeps |
|---|---|---|
Part Submission Warrant (Astemo Americas, 2026) | Submitted with every PPAP | Signed PSW with the customer's part and purchase order data |
Bulk Materials checklist (Astemo Americas, 2026) | Completed and jointly agreed; items not needed marked "Not Required" | Agreed checklist submitted with each PPAP by designated bulk suppliers |
Process flow (Astemo Americas, 2026) | Process Flow Description accepted as equivalent | Description of batch steps and sequence |
Process capability (Ford Motor Company, 2026) | Typically not demonstrated; ask the Ford site engineer | Agreed alternative evidence, if any |
Master sample (Astemo Americas, 2026) | May consist of manufacturing record, test results and certificate of analysis of key ingredients | Batch record and CoA for the approved sample |
Record retention (Astemo Americas, 2026) | Part active plus one calendar year; active plus 50 years if the end customer is GM | Full PPAP file kept on site |
The master sample row is the one most specific to chemicals. Many bulk material properties change with time, so the handbook accepts the manufacturing record, test results and certificates of analysis of key ingredients in place of a physical sample (Astemo Americas, 2026).
Which PPAP submission level applies to a bulk chemical?
The PPAP submission level for a bulk chemical is the one the customer specifies. The manual's Level 3 default is quoted for material outside the bulk definition, and the bulk minimum is the PSW with the Bulk Material Checklist. A 2013 forum reply that opens with "If the definition of bulk material is not applicable" quotes the 4th edition: "The organization shall use level 3 as the default level for all submissions unless otherwise specified by the authorized customer representative." (AIAG PPAP 4th edition, as quoted on Elsmar Cove, 2013)
Level 3 means the warrant with product samples and complete supporting data, which is why bulk materials fit Level 3 poorly. One customer handbook lists the five levels, from Level 1, warrant only, to Level 5, complete data reviewed at the supplier's site, and keeps Level III as its default unless its representative advises otherwise (Astemo Americas, 2026).
You will sometimes see Level 1 described as the usual level for bulk materials, but none of the manual extracts or customer documents cited here says so. Confirm the level with the customer. What the sources do say is that the minimum bulk submission is the PSW with the Bulk Material Checklist (Elsmar Cove, 2024), and that Ford sets PPAP level and PSW requirements in its Phased PPAP Handbook (Ford Motor Company, 2026).
Before the first submission, ask the customer to state the level on the purchase order or the checklist, and keep that statement in the PPAP file.
How should a PPAP waiver for bulk material be put in writing?
A PPAP waiver for bulk material should be a written statement from the authorized customer representative. It names the material, says which requirements are waived and is filed with your PPAP records. The 4th edition notes, as quoted in a forum thread, that such waivers can only be issued by an authorized customer representative and that the supplier should obtain documentation of waivers from that representative (Elsmar Cove, 2024).
No form is needed. An Elsmar Cove administrator advises suppliers to ask the customer for the waiver and get it in writing, making clear that the waiver supersedes the purchase order or other contract requirement (Elsmar Cove, 2008). He advises a customer writing a waiver to separate two things: a waiver of the submission, and a waiver of doing the element at all (Elsmar Cove, 2008).
Customer handbooks spell out the written form. Astemo Americas requires the PPAP file to contain a written waiver, in the form of a supplier request for engineering approval or an email, with the name of the representative granting it and the date (Astemo Americas, 2026). A waiver given only in a phone call cannot be shown to an auditor.
Treat the waiver like any other document sent to or received from the customer, and log it where the next person will find it. How to track every quote, proposal and report sent to a customer covers that habit for customer-facing documents.
Why do sources differ on whether a bulk chemical supplier must keep all PPAP elements?
Sources differ on whether a bulk chemical supplier must keep all PPAP elements because they describe different situations: no PPAP request at all, a request with a waived submission, and different editions of the manual. Read together, they contradict each other less than they first appear to.
In a forum thread started in 2000, a bulk supplier quoted the 3rd edition as saying PPAP is not required for bulk material suppliers unless requested, while its registrar's auditor said the 19 items of the 3rd edition table should still be kept in-house (Elsmar Cove, 2008). A forum reply sided with the auditor; in the same thread, a forum administrator advised customers writing a waiver to separate a waiver of submission from a waiver of doing the element (Elsmar Cove, 2008).
The 4th edition, which Ford's 2026 requirements are written for, keeps the bulk default: not required unless the customer specifies it (Bóllo, 2008). When a customer does require PPAP but waives the formal submission, one handbook is explicit: "If USAM-USHRP1 waives a formal submission, all items in the PPAP file must be reviewed and updated, as necessary to reflect the current process." (Astemo Americas, 2026)
The likely reading: with no PPAP requirement, there is no PPAP file to keep; with a requirement and a waived submission, the file is still kept and updated. That is a reasoned reading of the sources, not a ruling from AIAG.
When do IATF 16949 auditors ask a chemical supplier for PPAP records?
IATF 16949 auditors ask a chemical supplier for PPAP records when a customer has specified PPAP or another approval process, because IATF 16949:2016 ties product approval to customer-defined requirements. Clause 8.3.4.4, as quoted on Elsmar Cove, reads: "The organization shall establish, implement, and maintain a product and manufacturing approval process conforming to requirements defined by the customer(s)." (IATF 16949:2016, as quoted on Elsmar Cove, 2016)
The same clause adds that the organization shall approve externally provided products and services per ISO 9001, Section 8.4.3, prior to submission of part approval to the customer (Elsmar Cove, 2016). That is where an auditor may ask a formulator for raw material approvals.
IATF 16949:2016 is the first edition of the standard and cancels and replaces ISO/TS 16949:2009 (IATF, 2026). The IATF is revising the standard; its July 2026 communique plans a second edition for mid-2027 (IATF Stakeholder Communiqué 005, 2026).
Expect the request in three cases: the customer's purchase order or requirements call for PPAP; you have designated special characteristics on an ingredient (Elsmar Cove, 2012); or you claim a waiver, which the auditor will expect in writing. One forum participant reports that, unless the supplier has set up an "out" such as a PSW comment limiting the data, registrars' auditors expect a full PPAP file (Elsmar Cove, 2012). That is one practitioner's experience, not a rule. Lubinpla files an uploaded PPAP submission and written waiver under the customer by document type, and the customer's data room view shows the TDS, SDS and CoA shared with that customer.
Frequently asked questions
Does a certificate of analysis replace PPAP for a bulk chemical?
When the customer has specified PPAP, a certificate of analysis does not replace it, but it can be part of the evidence. One automotive customer accepts the manufacturing record, test results and certificates of analysis of key ingredients as the master sample for time-dependent bulk materials (Astemo Americas, 2026).
Is the Bulk Material Requirements Checklist the same for every customer?
No, the Bulk Material Requirements Checklist differs by customer. Customers issue their own versions; Astemo Americas, for example, uses its own form, SQA-Form-023, completed and jointly agreed with its quality representative, and may add requirements on the checklist itself (Astemo Americas, 2026).
When does an approved bulk material PPAP need to be resubmitted?
Resubmit an approved bulk material PPAP when the customer's triggers apply. One handbook requires approval before shipment after a change of material, process, plant location or source of subcontracted materials, and after tooling has been inactive for 12 months or more, unless its quality contact waives the submission for that part (Astemo Americas, 2026). Check each customer's own list.