How to quote a toll blending job and what the price should cover

Summary

Quoting a toll blending job takes 5 steps: fix scope, split material ownership, set the batch fee, price testing and packaging, agree a loss allowance. They apply when a blender processes another company's formula for a fee. Each value in the quote should carry its source and an as-of date, so the buyer can check it.

  • A toll blender processes raw materials into intermediate or finished products for a fee and does not take ownership of the product (Lubes'n'Greases, 2014).

  • Toll blending agreements set the charge per batch, kilogram, finished unit or machine hour, and can add minimum batch, setup, packaging, storage and testing fees (Hyperbots, 2026).

  • One US toll blender publishes a liquid minimum order of 220 US gallons (about 833 L) for pails and larger packaging and 1,000 gallons for bottled products (Royal Chemical, 2026).

  • ISO 9001:2026, edition 6, was published on 2026-09-16 and replaced ISO 9001:2015 (ISO, 2026).

This guide covers quoting the service of blending and packing liquid or powder chemicals, lubricants and additives for another company. It gives no fee levels, because published toll fee benchmarks were not found. It does not cover full contract manufacturing where the blender owns and sells the product, freight terms, or tax and customs treatment of tolling, which vary by jurisdiction.

What do you need before quoting a toll blending job?

Before you quote, you need the formula or blend sheet, the batch size and annual volume, a list of which raw materials the customer supplies, the test specification for release, the packaging, and the safety data sheet (SDS) for every raw material and for the finished blend. Without these, the quote prices a guess.

The customer's forecast matters as much as the first order, because many blenders set a minimum batch: one US blender publishes 1,000 lb (about 454 kg) as the minimum for powders and 220 US gallons (about 833 L) for liquids in pails and larger packaging (Royal Chemical, 2026). Another sets its minimum order at two pallets (Covia, 2026). Those are single published examples, not industry norms.

Ask for the SDS of the finished blend early. Section 14 of an SDS in the US OSHA format lists the UN number, transport hazard class and packing group, and that section is marked non-mandatory (OSHA, 29 CFR 1910.1200 Appendix D). An empty section 14 is therefore a question for the customer, not proof that no transport rule applies.

Also check that your site can handle the blend at all: one blender states it does not process carcinogens, mutagens, combustible dusts or flammable finished goods (Royal Chemical, 2026).

How do you quote a toll blending job, step by step?

The quote comes together in five steps, and each one fixes one part of the price before any number is written. Work through them in order: a later step depends on what the earlier one settled.

  1. Fix the scope. Write one line per service: receiving, storage, blending, filtration, testing, packaging, labeling and dispatch, and mark each as included or excluded.

  2. Split material ownership. For every raw material, state whether the customer supplies it or the blender buys it, and who owns work in process and finished goods at each stage (Hyperbots, 2026).

  3. Set the fee basis. Choose per batch, per kilogram, per finished unit or per machine hour, then state the minimum batch and any setup or changeover charge (Hyperbots, 2026).

  4. Price testing and packaging. List each release test, who issues the certificate of analysis, and the package size and type, each priced as a separate line.

  5. Agree a loss allowance. State the expected yield as a percentage of input, what happens to the difference, and who pays for an off-spec batch.

Write the as-of date and the source next to every value you enter in steps 3 to 5. A fee taken from an expired rate card, or a packaging price from an old supplier offer, is a frequent reason a quote is disputed later. For the wider practice of dating prices, see how to stop a price quotation going out with expired prices.

What does a toll blending fee usually include and exclude?

A toll blending fee usually covers the blending work itself: charging the vessel, mixing to the blend sheet and transferring the batch. It usually excludes raw materials, packaging, testing beyond an agreed release panel, storage past a free period, and freight. Those are priced as separate lines or left to the customer.

Toll blending agreements can add minimum batch sizes, setup charges, packaging fees, storage charges, testing fees and rules for supplemental materials on top of the processing charge (Hyperbots, 2026). Which of them you bundle into the fee is a commercial choice, but the quote must say which.

The table below lists the lines a toll blending quote should name and where each one usually sits; the placement is illustrative and varies by blender.

Quote line

Usually in the fee?

Note

Blending to the blend sheet

Yes

Per batch, kilogram, unit or machine hour (Hyperbots, 2026)

Setup or changeover cleaning

Often separate

State when it applies

Release testing and certificate of analysis

Separate or panel included

Name each test

Packaging, labels and filling

Separate

Price per package size

Storage of raw materials and finished goods

Separate after a free period

State the period in days

Freight

Usually excluded

Set by the agreed Incoterms rule

Setup and changeover cleaning is the row most easily left vague. A small batch can cost more to clean for than to blend, so state when the charge applies.

How do you price customer-supplied raw materials in a toll blending quote?

Customer-supplied raw materials are not priced as materials at all. The blender charges only for receiving, testing on receipt if agreed, storage and handling, and the quote states that the customer keeps ownership and the risk of supply.

Lubes'n'Greases describes the toll blender as a service provider that does not take ownership of the product and is not a distributor (Lubes'n'Greases, 2014). The quote should therefore show customer-supplied materials as zero-value lines with a handling charge, and blender-supplied materials as priced lines with a source and as-of date.

Customer-owned materials stored at the blender should be recorded so that ownership is kept separate from physical custody, with quantity, lot, identity and condition captured at each receipt (Hyperbots, 2026).

Quality systems treat these materials as customer property. ISO 9001:2015, clause 8.5.3, stated that "The organization shall identify, verify, protect, and safeguard customers' or external providers' property provided for use or incorporation into the products and services" (ISO 9001:2015, clause 8.5.3, as quoted by Core Business Solutions). ISO 9001:2015 was withdrawn when ISO 9001:2026 was published on 2026-09-16 (ISO, 2026), so check the matching clause in the edition the blender is certified to.

The quote should also state who pays when a customer-supplied lot arrives off-spec or short, and whether the blender may reject it. It should name who insures customer-owned material while it sits in the blender's custody, and up to what value.

Who carries blending loss and off-spec batches in a toll blending quote?

Blending loss and off-spec batches fall on the party named in the quote. One workable split: the customer carries normal process loss within an agreed allowance, while the blender carries loss above it and off-spec batches caused by its own errors.

No source found for this guide gives a standard loss percentage, so the allowance is a number the two parties agree. A toll blending glossary gives an illustrative case: if 50,000 kg of input is expected to give 49,500 kg of finished product, the agreement should define how the remaining 500 kg is treated (Hyperbots, 2026). Normal loss, approved variance, rework and unexplained differences each carry different commercial consequences.

Write three things into the quote. First, the expected yield and the allowance as a percentage of input, and how it is measured: weighed input against weighed or metered output. Second, what happens to an off-spec batch (rework, blend-off into later batches, return or disposal) and who pays. Third, how lost customer-owned material is reported. Under ISO 9001:2015, clause 8.5.3, lost or damaged customer property had to be reported to the customer with documented information kept (ISO 9001:2015, clause 8.5.3, as quoted by Core Business Solutions). Disposal of an off-spec batch follows the blend's SDS section 13 and the waste rules of the site's jurisdiction.

How do you check a toll blending quote before it goes out?

A toll blending quote is ready to go out when every line names its owner, basis, source and as-of date, and the loss and off-spec terms are written, not assumed. The check table below decides whether the quote can be sent; values in it are illustrative unless a source is given.

Check

Pass

Fail and what to do

Material ownership per line

Each raw material marked customer-supplied or blender-supplied

Unmarked line: ask the customer and mark it

Fee basis and minimum batch

One basis stated, minimum batch in kg or L

Two bases or no minimum: pick one and state it

Testing and certificate of analysis

Each release test named, issuer stated

"QC included" only: list the tests

Packaging and storage

Package size priced, free storage period in days

Storage open-ended: add a period and a daily rate

Loss allowance and off-spec

Yield, allowance and off-spec handling written

Silent on loss: add the three terms above

Source and as-of date

Every value has a source and a date

Undated value: confirm it or remove it

The last row is the easiest to miss: a fee or packaging price copied from an older quote without its date.

Freight is a separate decision. Incoterms 2020 sets delivery, risk and costs between seller and buyer, with all costs for a rule listed at article A9/B9 (ICC, 2020); it does not set the blending fee.

Before sending, have a second person read the quote against the customer's request, line by line. A requested service missing from the scope list, or a test named in the specification but not in the price, will surface at the first invoice if nobody catches it now.

Lubinpla's quote drafting task first fixes what a quote covers, then attaches a source and as-of date to each value; it does not calculate prices.

Frequently asked questions

Should a toll blending quote charge per batch, per kilogram or per unit?

A toll blending quote can charge per batch, per kilogram, per finished unit or per machine hour (Hyperbots, 2026). Per batch suits fixed batch sizes, per kilogram suits variable volumes, and per unit suits packed goods. Pick one basis per line, state the minimum batch, and keep setup charges separate.

What source and as-of date should each toll blending price carry?

Each price should carry where it came from, such as the blender's rate card, a raw material supplier offer or an energy surcharge table, and the date that source was valid. A price without a date cannot be checked later, so confirm it or leave it out of the quote.

Does a toll blender need to be ISO 9001 certified?

ISO states that certification to ISO 9001 is not mandatory (ISO, 2026), so a toll blender needs it only when a customer's supplier approval asks for it. If the blender is certified, ask which edition, because ISO 9001:2026 replaced ISO 9001:2015 on 2026-09-16 (ISO, 2026).